FastXmas Extended Reflective Dog Leash & Collar Set – 59″ Long Lead & Adjustable Neck 11″-15.5″ for Small Dogs Outdoor Walking,Purple

$7.32

Description

WalmartPrice: 7.32$

1+1 Dog Walking Set Leash With Reflective Threads And Cushioned Handle Plus Neck Strap With Reflective Threads Feature: Quantity: 1Pcs Colour:Purple Material:Nylon Neck circumference:30-40cm/11.81-15.74in Rope length:150×1.2cm/59.05×0.47in Package size:25x20x5cm/9.84×7.87×1.97in Net weight:230g/0.51lb Gross weight:230g/0.51lb Descrition: 【Two‑Piece Set】Includes one 5‑foot (150cm) walking line with cushioned grip, and one neck strap with reflective threads. 【Reflective Threads on Both】Both the leash and the neck strap have threads that shine in low light. Helps you see your pet at night. 【Cushioned Handle on Leash】The leash’s holding area is padded with thick foam‑like material. Reduces pull strain on your hand. 【Neck Strap with Press Type Buckle】The neck strap opens and closes with a press‑type buckle. Fits neck sizes from 30cm to 40cm. 【360° Rotating Hook】The hook at the end of the leash turns fully.Stops the leash from twisting during use. Package Content: 1x Dog Leash 1x Dog Handle

【Two‑Piece Set】Includes one 5‑foot (150cm) walking line with cushioned grip, and one neck strap with reflective threads. 【Reflective Threads on Both】Both the leash and the neck strap have threads that shine in low light. Helps you see your pet at night. 【Cushioned Handle on Leash】The leash’s holding area is padded with thick foam‑like material. Reduces pull strain on your hand. 【Neck Strap with Press Type Buckle】The neck strap opens and closes with a press‑type buckle. Fits neck sizes from 30cm to 40cm. 【360° Rotating Hook】The hook at the end of the leash turns fully.Stops the leash from twisting during use.

Reviews

There are no reviews yet.

Be the first to review “FastXmas Extended Reflective Dog Leash & Collar Set – 59″ Long Lead & Adjustable Neck 11″-15.5″ for Small Dogs Outdoor Walking,Purple”